8/22/2012: Deconstruction Begins
8/24/2012: Power House Removal
8/27/2012: Wheels Keep On Turning
9/6/2012: Dredging, Sediment, and Zebra Mussels, Oh My!
9/12/2012: Trumpeter Swans Prep for Flight; Molon Preps for Drawdown
9/21/2012: What a Difference a Week Makes!
9/29/2012: A 20,000 lb. Pile Driver
10/3/2012: Building the Temporary Dewatering Structure
10/5/2012: Updated Pictures from the Project
10/8/2012: Wow, What a Couple of Days it’s Been
12/4/2012: The Rebirth Continues
12/20/2012: Updates from Brown Bridge
4/3/2013: What a Difference a Year Makes
**OCTOBER 6 INCIDENT PROJECT TEAM SUMMARY**